In July 2026, at the national-level entrepreneurship competition HICOOL, the space intelligence and world model-oriented company Feidu Technology won first prize. This company built a full-stack space intelligence infrastructure based on “Zhengrong Large Model”, covering unified data standards, a five-layer technology stack, and the Yuanzun S800 integrated machine. Its core capability is to convert the real world into computable replicas, achieving a shift from experience-driven decision-making to model-driven reasoning through technologies such as dynamic boundary control. In the scenario of water conservancy and flood prevention, this system compresses the time required for full-domain simulation of large river basins from days to minutes, and can pre simulate flood progression and optimal scheduling plans, verifying the practical value of world models in generating steering simulations and decision-making.
It is not possible to generate a summary. The provided article content only includes the title (about comparing SpaceX with a Chinese world model company) and an unfinished phrase (“When AI begins to ‘preempt’ a heavy rain”), lacking text that describes specific events, people, data, or facts, and thus cannot meet the requirements of the inverted pyramid structure and the need to be faithful to the original text’s facts.
During the severe flooding in China in July 2026, the first prize of the national-level entrepreneurship competition HICOOL was awarded to Space Intelligence and World Model. The winning company is Feidu Technology. This company has developed a full-stack space intelligence infrastructure based on “Zhengrong Large Model”, including “3DT” unified data standards, a five-layer technology stack, and the Yuanzun S800 integrated machine, aiming to address the shortcomings of large models in reaching the physical world. Its core capability lies in transforming the real world into computable replicas, achieving a shift from experience-driven decision-making to model-based reasoning through dynamic boundary control, 1:1 verification, and intelligent scheduling. In water conservancy and flood prevention scenarios, this system can reduce the time required for comprehensive simulation of large areas of watersheds from days to minutes, and pre- simulate flood progression and optimal scheduling plans before disasters occur, verifying the practical value of world models in shifting from generation to reasoning and decision-making.